Monday, June 12, 2006

Heat for the new kitchen.


The heat for the new kitchen comes from a powered heater, called a toester. The heater is installed under a kitchen cabinet. It has an electric fan, and hot water pipes. I needed to drill some holes to the basement to connect the heater to the proper zone on the furnace. This section of the kitchen is located above the old garage, so the holes were drilled in the concrete that provided the roof to the old garage. Between the plumbing, electrical, woodworking, and concrete work, I spend a good 3 hours installing the heater, and I still have more work to hook this up to the furnace. (what a pain)

0 Comments:

Post a Comment

<< Home