Monday, June 14, 2010

Wall Part 2

We worked Saturday in the drizzle, to get the site ready for laying the blocks. I covered the dirt with blue tarps so the dirt would not turn into mud and fill up my trench. I also found out that I had under estimated the number of blocks I needed. I though that I needed 130 blocks, but I actually needed 350 blocks, So this morning I ordered another 230 blocks. It will take a while to stack all of that block.
Here is a picture of the trench and stone that will be used as a foundation for the wall. We should be laying block by Friday.