Monday, June 21, 2010

Wall Part 3

More work was done on the wall this weekend. The wall is going to be 6 blocks high. As of today most of the wall is 5 blocks high. As soon as the end of the wall is done, I will put in the drainage pipe and back fill. It would be nice if the wall was done by next weekend. It will depend on the weather.

Here is a picture of the back of the wall. Erik put in the foundation blocks and stacked most of the blocks on Saturday. I stacked blocks on Sunday and dumped fill in front of the wall. I still need friends and neighbors to come over and add a block.


0 Comments:

Post a Comment

<< Home